You are using an out of date browser. It may not display this or other websites correctly. You should upgrade or use an alternative browser.
m.p.-17
Railroadforums.com is a free online Railroad Discussion Forum and Railroad Photo Gallery for railroaders, railfans, model railroaders and anyone else who is interested in railroads. We cover a wide variety of topics, including freight trains, passenger and commuter railroads, rail news and information, tourist railroads, railway museums and railroad history.
Driving pilings for bridge supports main two double track M.P.-17 Edmonds Wa.at this angle as the train pass by and the exhaust from the pile driver exits at the top of the train it looks like its pile driving the train.
little late posting this .After moving main one to the east making a real snake like route from curve around south M.P.16.9 or so to around where new bridge is to be put in,then back to main line into Edmonds on Sat. 10/9/2010 with a 10 hour window they cut the track and moved it back...
Sorry about the blur a grab shot i had to take overtop of a fence and hope that the camera would foucus on somthing as the train was going by, a ballast work train with its two caboose's passing a crane pile driver installing interlocking sheet piles for work on a new bridge im told at the end...