rogerfarnworth
Member
This article focuses on relatively recent news about the railways of Egypt. ...
A. Cairo Monorail Project: The 56.5km East Nile line began operations in March 2026, serving 22 stations with driverless technology, reducing Cairo congestion. A second line, bringing the total network to over 100km, is under development.
B. High-Speed Network: Siemens Mobility is constructing a 2,000 km network, featuring Velaro and Desiro HC trains traveling up to 250 km/h, covering 60 cities.
C. Modernisation: of Egypt's 10,000 kilometre rail network. ......
http://rogerfarnworth.com/2026/07/28/egyptian-rail-news-summer-2026/
A. Cairo Monorail Project: The 56.5km East Nile line began operations in March 2026, serving 22 stations with driverless technology, reducing Cairo congestion. A second line, bringing the total network to over 100km, is under development.
B. High-Speed Network: Siemens Mobility is constructing a 2,000 km network, featuring Velaro and Desiro HC trains traveling up to 250 km/h, covering 60 cities.
C. Modernisation: of Egypt's 10,000 kilometre rail network. ......
http://rogerfarnworth.com/2026/07/28/egyptian-rail-news-summer-2026/
